Shunli Motor 2215 Smart Lock Motor Steering Gear Automatic Door Lock Micro Motor Gearbox Reduction of Smart Lock

Product Description

Product Overview
Product Description
2215 smart lock motor steering gear automatic door lock micro motor gearbox reduction motor
Smart Lock Motor
Motor Customized Specification
Reference Drawing - GM2215
GM2215 Drawing
Reference Drawing - GM2219
GM2219 Drawing
Reference Datasheet
Gearbox Technical Data
Parameter Specification Details
Ratio 199K / 241K / 265K
Max. Rated Torque 1.5 ~ 2.5 Kgf.cm
Max. Gear Breaked Torque 4 ~ 5 Kgf.cm
Gearbox Efficiency 45% ~ 60%
Gearmotor Technical Data
Gearmotor Model Ratio Rated Voltage (V) No-Load Rated Stall
Speed (RPM) Current (mA) Speed (RPM) Current (mA) Torque (mN.m / gf.cm) Current (mA) Torque (N.m / Kgf.cm)
GM2215FMN20-199K 1 : 199 4.5 VDC 52 ≤ 50 40 ≤ 120 18 / 180 ≤ 350 0.18 / 1.8
GM2222FMN20-230K 1 : 230 4.5 VDC 58 ≤ 78 49 ≤ 135 24 / 240 ≤ 450 0.2 / 2.0
GM2219FMN20-265K 1 : 241 4.5 VDC 58 ≤ 65 50 ≤ 130 24 / 240 ≤ 680 0.2 / 2.0
GM2219FMN20-265K 1 : 241 4.5 VDC 62 ≤ 75 51 ≤ 140 35 / 350 ≤ 750 0.22 / 2.2
Product Showcase
Motor Model Option 1
Motor Model Option 2
Factory Product Line 1
Factory Product Line 2
Factory Product Line 3
Factory Product Line 4
Quality Standard Assurance
FAQ
QAre you a trading company or manufacturer?
We are a factory. We specialize in micro DC motors and DC gear motors with over 14 years of professional experience.
QWhat is the payment term for a new customer?
We support online trade assurance orders allowing payment via credit card (MasterCard, Visa), PayPal, or wire transfer (T/T).
QI cannot find a suitable motor on your website, can you customize the motor for me?
Yes, we can customize parameters, dimensions, and specifications to align perfectly with your requirements.
QDo you have certificates for the motors?
Yes, we hold CE, FCC, ISO, and other relevant standard credentials. We can also apply for specific certificates upon your request.
QHow is your Quality Control managed?
We maintain dedicated inspection staff across all production lines. Finished units undergo rigorous testing on diagnostic gear including Hardness Testers, 2.5D Image Testers, Salt Spray Chambers, Life Testers, Temperature Test Machines, and Noise Testers.
QWhat is the lead time for product samples and mass production?
Generally, samples take around 7-10 days to prepare, while mass production runs take 20-30 days depending on the customization details and overall order volume.
Certificate Banner
Footer Banner Graphic

Related Products